$27 Million for California Apartment EV Charging. Here's How to Get Some.
California has a program that pays apartment properties back for putting in EV chargers. It's called Communities in Charge, it's funded by the California Energy Commission, and it's built only for multifamily housing.
A new round, Funding Wave 5, is coming. The program says about $27 million is set aside and it's expected to open in the first half of 2027.
If your properties are outside California, keep reading. The money has moved to state and utility programs everywhere, and the part that decides whether you get any of it works the same way in every state.
What the last round paid
Wave 5 terms haven't been published yet. But the round that just closed gives you a good idea of the size of this.
$8,500 for each Level 2 charging port.
$2,000 for each Level 1 smart outlet.
An extra $3,500 per Level 2 port, or $800 per Level 1 outlet, for multifamily sites run by Tribal governments, Tribal entities, or nonprofits serving Tribal communities.
Put four Level 2 ports in at one property and you're looking at $34,000 back at last round's rates. That's real money, and it's why these windows fill up.

Who can apply
You have to be the property owner, an authorized lessee, or someone officially representing them, like a facilities manager. You also have to be the one actually paying for the work.
Single-family homes, duplexes, triplexes, townhomes, and mobile homes don't qualify unless the chargers are shared among residents. Sites that already have chargers up and running don't qualify either.
Last round covered both shared and assigned parking spaces, as long as the space serves at least one resident.
Funding could open in two months
First half of 2027 could mean January. It could mean June. Nobody has said which.
If it's January, you have about two months. A charging project takes one to four months just to get through design, permitting, and the utility, and that's before anybody touches a shovel. Properties that start when the window opens will not be ready in time.
Here's what happens with these programs. The money gets announced, everybody waits for the application to go live, and then everybody applies at once. The owners who get funded are the ones who already knew what their property could handle, already had a real price, and already had someone lined up to do the work.
Most of these programs pay out first come, first served. Being ready is the whole game.
What filing actually looks like
Grant applications are not one form. They're a stack of them, and the stack grows as the project moves.
You need proof of who owns the property. You need a site plan. You need electrical drawings and a load study showing the building can carry the new load. You need itemized quotes. You need permits. Later you need receipts, photos of the finished work, serial numbers for every charger, and a final report that has to match everything you said at the start.
Miss one piece and the file sits. Submit a number that doesn't match a later invoice and you start over. Some programs give you a deadline from the day they approve you, and the clock runs whether your paperwork is moving or not.
It's a long, tedious job. It's also the part nobody budgets time for.
We do this all the time
REVS files these applications for our customers. We know which programs are worth chasing, what each one wants, and how to keep a file from stalling.
We recently filed for a customer across two of their properties and brought back $66,000. That took three years of back and forth. The customer didn't chase any of it. That's our job, and it's the part we take off your plate.
California isn't the only one
State and utility programs are most of what's left right now. The federal tax credit for charging equipment ended for anything not finished and running by June 30, 2026, so the money has moved to states and power companies.
Those programs come and go, and the rules are different everywhere. Tennessee opened a multifamily rebate this fall that pays 60 percent of project costs. Utilities in several states pay for the wiring and the trenching, which is usually the expensive part nobody sees.
We track them so you don't have to.

We can take everything off your plate
Filing for money is one piece. REVS also plans the project, finances it, installs it, runs the stations, and handles the billing and the support calls from residents.
If you'd rather not spend a dollar up front, we can own the stations outright. We cover everything and we take the revenue. If you'd rather own them, we can finance the project and you pay it back over time. If you already own your stations, we can run them for you.
Our multifamily EV charging page walks through how these projects come together, and our financing page covers the ways to pay for one.
Start with what your property can handle
Before any of this, you need to know what your building can actually support. That one answer sets your real cost, your real rebate, and how fast you can move when a window opens.
An EV charging due diligence report tells you that. It's the first thing we do, and it's what turns a grant application from a scramble into a form you already have the answers for.
If you own or manage apartments and you want to be ready when Wave 5 opens, contact REVS and we'll take a look at your properties.
%20copy.png)